1.141-7T (g) Allocations of output facilities and systems --

(1) Facts and circumstances analysis.

Whether output sold under an output contract is allocated to a particular facility (for example, a generating unit), to the entire system of the seller of that output (net of any uses of that system output allocated to a particular facility), or to a portion of a facility is based on all the facts and circumstances. Significant factors to be considered in determining the allocation of an output contract to financed property are the following:

(i) The extent to which it is physically possible to deliver output to or from a particular facility or system.

(ii) The terms of a contract relating to the delivery of output (such as delivery limitations and options or obligations to deliver power from additional sources).

(iii) Whether a contract is entered into as part of a common plan of financing for a facility.

(iv) The method of pricing output under the contract, such as the use of market rates rather than rates designed to pay debt service of tax-exempt bonds used to finance a particular facility.

(2) Illustrations.

The following illustrate the factors set forth in paragraph (g)(1) of this section:

(i) Physical possibility.

Output from a generating unit that is fed directly into a low voltage distribution system of the owner of that unit and that cannot physically leave that distribution system generally must be allocated to those receiving electricity through that distribution system. Output may be allocated without regard to physical limitations, however, if exchange or similar agreements provide output to a purchaser where, but for the exchange agreements, it would not be possible for the seller to provide output to that purchaser.

(ii) Contract terms relating to performance.

A contract to provide a specified amount of electricity from a system, but only when at least that amount of electricity is being generated by a particular unit, is allocated to that unit. For example, a contract to buy 20 MW of system power with a right to take up to 40 percent of the actual output of a specific 50 MW facility whenever total system output is insufficient to meet all of the seller‘s obligations generally is allocated to the specific facility rather than to the system.

(iii) Common plan of financing.

A contract entered into as part of a common plan of financing for a facility generally is allocated to the facility if debt service for the issue of bonds is reasonably expected to be paid, directly or indirectly, from payments substantially certain to be made under the contract (disregarding default, insolvency, or other similar circumstances).

(iv) Pricing method.

Pricing based on the capital and generating costs of a particular turbine tends to indicate that output under the contract is properly allocated to that turbine.

(3) Transmission contracts.

Whether use under an output contract for transmission is allocated to a particular facility or to a transmission network is based on all the facts and circumstances, in a manner similar to paragraphs (g)(1) and (2) of this section. In general, the method used to determine payments under a contract is a more significant contract term for this purpose than nominal contract path. In general, if reasonable and consistently applied, the determination of use of transmission facilities under an output contract may be based on a method used by third parties, such as reliability councils.

(4) Allocation of payments.

Payments for output provided by an output facility financed with two or more sources of funding are generally allocated under the rules in section 1.141-4(c).